Thursday 26 July 2007

Start of two scarves

Have now warped a 4.1m length of a stripped 2-ply wool in silver-grey and charcoal. I will use the silver-grey yarn as the weft for the first scarf and the charcoal yarn for the second scarf. Both scarves will be in herring-bone pattern
I am currently weaving the first scarf!

Sunday 22 July 2007

Fabric finished

Have today just finished weaving my 6m length of fabric.

This is what it looks like on the take-up drum on the loom.

I now have to wash and iron it before I can take it to a tailor to make up into a jacket.
It is 6.37m long and 88.5mm wide off the loom so will have to see how much it shrinks in the washing. It weighs 1039g!

Monday 16 July 2007

Baby sitting in Albany



For the first weekend of the school holidays I went to Albany in order to baby-sit Matthew and Ben on the Monday and Tuesday whilst Debbie worked. I travelled down on Saturday so on the Sunday we all went out for a drive to Denmark. Our first stop was at a winery and puzzle shop where we spent about an hour playing with the wide range of puzzles.


Then a stop at the Lake House winery for wine tasting and lunch.

Then another stop at a winery and chocolate shop where purchases were made of port, cheese and fudge.
On the Monday I took the two boys out whale watching on a sailing catamaran.
On the trip we saw a total of four whales and a seal colony.




Then on the Tuesday I took Ben to the Dorothy the Dinosauer's Dance Party in the Albany Town Hall - sorry no pictures of this show.

I returned to Perth on the Wednesday after my four day holiday.

Sunday 1 July 2007

Sunday 1 July 2007

I have now started to weave a piece of material 6m long x 80cm wide (It is actually 95cm through the reed so have allowed plenty for shrinkage). It is a stripped fabric in charcoal and feathering 1-ply natural wool (from Bilby Yarns) and woven in a herring-bone pattern.


It looks very nice and my plan is to have it made into a sports jacket, provided I can find a suitable tailor. It seems a very large amount of cloth for a jacket but just wanted to be on the safe side. A tailor told me they usually use 2.1m of 160cm wide material for jackets, so as I can only make about 80cm wide (100cm through the reed but have to allow for shrinkage), I have doubled the length and then added 50% just to be on the safe time. My aim is to finish weaving it by the end of July so will have to see how I go.

Thursday 28 June 2007

Thursday 28 June 2007

I have now finished the two lengths of fabric that had been ordered, after already supplying one piece earlier. The two new lengths and a piece of the first is shown.

The light piece is in plain weave and the darker one is herringbone.




Sunday 17 June 2007

Sunday 17 June 2007

Just to let you know that I am busy weaving two lengths of woollen fabric. One has been completed and is 3 m x 50 cm of a 1-ply wool with a herringbone pattern.
The second piece is still being woven but will be 4.5 long x 60 cm of a 2-ply wool in a plain weave pattern.


Will be able to show you the completed fabric by the end of this coming week.

Saturday 16 June 2007

Saturday 16 June 2007

Spent Friday evening at Sue's house where Paul, Matthew and Ben were also visiting. Tom has to dress up as an Mexican at some function soon so this is his (or Sue's) first attempt!


When I went to drive home my car would not start so had to stay the night. Hence was still at Sue's for breakfast.

Had to arrange to have my car taken to Osborne Park and then get a taxis back to Shelley.

Friday 15 June 2007

Friday 15 June 2007

Just setting up my blog so this will be a simple entry.
I am going this afternoon to Sue's house since Paul and the boys will be arriving from Albany.
Hopefully will have some photos to post after the visit.